EPLeadsUSA

Structural Drying to Documented Standards

Call (319) 657-6188

Surface-dry doesn't mean dry. Moisture trapped in subfloors, wall cavities, and framing causes rot, mold, and failed flooring months later. Professional structural drying uses psychrometrics — the science of air, temperature, and humidity — to dry materials fully.

Technicians place commercial dehumidifiers and air movers strategically, then verify with daily moisture readings until materials hit dry standard. You get documentation your insurer accepts.

What's included

  • Commercial LGR dehumidification
  • Strategic air mover placement
  • Daily moisture monitoring and logs
  • Hardwood floor rescue drying
  • In-place drying that saves materials

Common questions

How long does structural drying take?

Typically 3–5 days for standard losses, longer for hardwood or dense materials. Rushing it is how you end up with mold behind walls.

Standing Water? Don't Wait.

Water damage can begin causing mold within 24–48 hours. Call immediately — every hour counts.

Call (319) 657-6188
Call Now Free Estimate